Ich habe eine Route geplant und wollte die Donau per Fähre queren. Dabei kam eine für mich unklare Streckenführung zu Stande. Zwischen Shaping Point 8 und 9 wird die Donau gleich drei mal gequert?
@Didi_790, nehme mal die Vermeidung Kleinste Straßen raus, oder zumindest auf 4, dann klappt es
That thing about the smallest roads is probably the reason. The access road to the pier is a small road. I had set that after I had turned around, frustrated, at the fifth farm track with the setting “Fast and curvy”…
A new Example for a Routing i do not understand. Why is not the direct way routed from Rainbach to Point 2?
If you turn off avoid current closures, it works. Apparently, there’s a closure recorded in TomTom.
Okay, there was no closure on Sunday. Maybe its only from Monday to Friday. Would be helpfull to see closures if turned on too.
Actually not closed, only Roadworks, Speed Limit and narrowed Lanes.
The articlе statеs clеarly that thе construction sitе is schеdulеd until Dеc 31, 2026.
Sincе this is a construction sitе rеportеd by TomTom, as Rumbrummer has alrеady mеntionеd in your othеr post, thе rеport is obsoletе in thе OSM arеa.
Okay, then it’ll just stay closed in Kurviger even though it’s open.
A construction site finishing 2 months early… in Germany, that breaks the system.
But TomTom really needs to get its act together then.
Just for info:
The construction site is in Austria, and I couldn’t find any indication in this post that this site is already officially „completed“.
I merged the double post for better clarity.
